From the Archives of a Common Sensei – Volume 14: Learn by Doing


In volume 13 we discussed an example of how management at a Toyota facility standardized their meeting (and communication) scheduling in a standardized rhythm.  The meetings we discussed are inclusive of those with primary responsibility and those who are primarily affected by the decisions. In this blog (volume 14), we show you a “standardized” approach to assuring consistency of safety, quality, and timing in process operations.

Please note that the emphasis here is training verification within a process (operation) whenever either a new Associate joins the team, or when an existing Associate moves from one process to another process they have not previously performed.  Instead of describing creation of a process instruction sheet here, the emphasis is on a method of “instruction and verification of an Associate’s capability” to perform the necessary work within the bounds of safe operation, and with the expected quality and time standards.  This process pulls together the primary team of involved people, Associate, Trainer, Team Leader (TL), and Group Leader (GL).  The form captures the: Date Training step is completed, the initials of the Associate indicating understanding of the process, and the initials of the trainer confirming that the Associate has successfully completed the required training to the standard (including safety, quality, and time).

In the mindset of “train/do, train/do, train/do”, the attached forms provide a place where the trainer can initiate indicating the Associate has successfully repeated the process cycle 10 times with appropriate overall quality.

On the second page of the attached form, in step 12, the Leader decides if the process instruction is complete.  If the answer is “yes”, the Leader will then check the Associates performance twice a day and record the performance, safety, and quality.  This will be repeated for 5 days!  If a problem is found, the Associate will be retrained, and the monitoring will be repeated.  This is followed by confirmation by the Group Leader to make sure the Team Leader has followed all the steps.  If a deviation to the standard training or expected results is found, the problem is to be corrected immediately.

This method of training emphasizes the development of a standard method to achieve process (safety, quality, time) assurance.  Select key processes within your organization and apply this method!  Yes, it takes time in the short term, but saves injury, poor quality, and lost time in the not to distant future.  In addition to raising Associate moral, this type training will also reduce operating expense.

For More Information or help with your transformation effort, contact us at http://www.per-strat.com

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s